Skip to main content
GSEnergy Efficiency - DomesticMalawiAMS-II.G

GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 29

GS-3934 ↗ · current registry ID: GS11928

#45of 1329 in Industrial#8of 92 in Malawi#125of 1801 in Gold Standard (GS)#15of 189 in AMS-II.G

6.1/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
5.5
Documentation
6.5

Audit Analysis

A Gold Standard improved-cookstove project in Malawi with a VVB-confirmed investment additionality test, a quantified 5% leakage deduction, and no reported reversal events. However, the project relies on a project-specific baseline, no buffer pool is documented, and significant discrepancies exist between the monitoring report and verification report on claimed ERR figures and the crediting period, undermining confidence in the data chain.

Red Flags

  • Claimed ERR differs by a factor of ~3 between the monitoring report (243,647) and the verification report (760,155), with no clear explanation in the extracted record
  • Crediting period is stated as 2016–2025 in the monitoring report but 2021–2036 in the validation report, creating ambiguity about the project's lifetime and pro-rata expectations
  • No lifetime ex-ante ERR estimate is available in the extracted record, preventing a proper pro-rata over/under-delivery check

Credit Vintages

IssuedRetiredAvailable
2021
7,64407,644
2022
6,06906,069
2023
3,82603,826
Total17,539017,539

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

crediting period in final year

Leakage

5% quantified deduction with justification

Baseline

Project-specific baseline; reassessment timing not stated

Safeguards

FPIC, grievance mechanism, and safeguards documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10AMS-II.G

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents