GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 35
GS-3931 ↗ · current registry ID: GS11931
#85of 1329 in Industrial#15of 92 in Malawi#188of 1801 in Gold Standard (GS)#24of 189 in AMS-II.G
Audit Analysis
A Gold Standard improved-cookstove project in Malawi with VVB-confirmed additionality, a quantified 5% leakage deduction, and no reported reversal events. However, multiple cross-document contradictions—particularly on the crediting period (2016–2025 vs 2021–2036) and the claimed ERR figure (243,647 vs 760,155)—undermine confidence in the data integrity and raise over-crediting concerns. The project-specific baseline and absence of a stated buffer pool further limit the robustness of the integrity case.
Red Flags
- Crediting period contradiction: the monitoring report (2023) states 2016-10-15 to 2025-03-31, while the validation report (2022) states 2021-10-15 to 2036-10-14 — a 15-year vs 8.5-year discrepancy that cannot be reconciled from available documents
- Claimed ERR contradiction: the monitoring report lists 243,647 tCO₂e while the verification report (same date, 2024-12-03) lists 760,155 tCO₂e, a 3.1× difference with no explanation in the extracted record
- Baseline is project-specific rather than jurisdictional or standardised, and the last baseline reassessment date is not found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 42,830 | 0 | 42,830 | |
| 2022 | 32,165 | 0 | 32,165 | |
| 2023 | 22,810 | 0 | 22,810 | |
| 2024 | 5,507 | 0 | 5,507 | |
| Total | 103,312 | 0 | 103,312 |
Risk Indicators
VVB-confirmed investment test
no reversals reported
5% quantified deduction
Project-specific; reassessment date not found
FPIC, grievance mechanism, and safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →