GS11935 GS11934 RVPA-02 Promoting sustainable use of biomass energy resources in targeted communities
GS-4678 ↗ · current registry ID: GS12701
#64of 1329 in Industrial#4of 101 in Nepal#154of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-verified additionality, a quantified 5% leakage deduction, and no reported reversal events. However, the verified emissions reduction (91,239 tCO₂e) is roughly double the ex-ante estimate (47,333 tCO₂e) from the validation report, raising over-crediting concerns. Multiple data contradictions across documents and an unresolved FPIC status weaken confidence in the project's safeguards and data reliability.
Red Flags
- Verified ERR of 91,239 tCO₂e is approximately 193–964% of the ex-ante estimate of 47,333 tCO₂e from the validation report, depending on whether the latter is a first-year or lifetime figure — a significant over-delivery that warrants scrutiny
- FPIC status is contradictory: the earlier validation report (Nov 2023) states FPIC was conducted, while the later validation report (Sep 2024) states it was not; the more recent document is privileged, indicating FPIC was not conducted
- No buffer pool or explicit permanence mechanism is documented, and the fNRB unit inconsistency (91.44 vs 0.9144) across the verification and monitoring reports suggests a documentation quality issue
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 382 | 0 | 382 | |
| 2023 | 9,309 | 0 | 9,309 | |
| 2024 | 2,321 | 0 | 2,321 | |
| Total | 12,012 | 0 | 12,012 |
Risk Indicators
VVB-confirmed combined test
low inherent risk for cookstoves
5% quantified deduction
Project-specific; no reassessment data
Grievance mechanism present; FPIC not conducted per latest doc
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →