Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-05 Promoting sustainable use of biomass energy resources in targeted communities

GS-4681 ↗ · current registry ID: GS12704

#603of 1329 in Industrial#59of 101 in Nepal#929of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence (no buffer pool, reversal events unaddressed), safeguards (FPIC not conducted per the most recent validation report), and monitoring detail. Multiple inter-document contradictions and low extraction confidence reduce confidence in the data record.

Red Flags

  • FPIC status contradicts between the 2023 and 2024 validation reports; the more recent (2024) report states FPIC was NOT conducted, raising safeguards concerns for a community-targeted cookstove project
  • No buffer pool or permanence mechanism identified, and reversal events are explicitly 'not addressed' — a material risk for a 5-year cookstove deployment where stoves can be abandoned or broken
  • Usage rate assumed at 100% with no verified usage data and no end-use tracking method documented
  • Low extraction confidence across the document set, combined with four inter-document contradictions, undermines reliability of the extracted record

Credit Vintages

IssuedRetiredAvailable
2023
9,28409,284
2024
2,32102,321
Total11,605011,605

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversals unaddressed

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment not stated

Safeguards

Grievance mechanism present; FPIC not conducted (2024)

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents