GS11935 GS11934 RVPA-08 Promoting sustainable use of biomass energy resources in targeted communities
GS-4684 ↗ · current registry ID: GS12707
#604of 1329 in Industrial#60of 101 in Nepal#930of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence (no buffer pool, reversal events unaddressed), monitoring transparency (claimed and verified ERR are identical with no monitoring period stated), and a 100% usage-rate assumption that has not been independently verified. Multiple contradictions across documents and low extraction confidence further reduce confidence in the data.
Red Flags
- Total ERR claimed and verified are identical (47,333 tCO2e) with no monitoring period stated, strongly suggesting no post-implementation verification has actually been conducted
- No buffer pool percentage is stated and reversal events are explicitly 'not addressed', leaving permanence risk unmitigated
- FPIC status is contradictory: the 2023 validation report states it was conducted, while the more recent 2024 validation report states it was not
- 100% usage rate assumed with no verified usage rate available, and usage monitoring relies solely on an annual survey
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 8,417 | 0 | 8,417 | |
| 2024 | 2,321 | 0 | 2,321 | |
| Total | 10,738 | 0 | 10,738 |
Risk Indicators
VVB-confirmed combined test
reversals unaddressed
5% quantified deduction
Project-specific; no reassessment date
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →