GS11935 GS11934 RVPA-13 Promoting sustainable use of biomass energy resources in targeted communities
GS-4689 ↗ · current registry ID: GS12712
#442of 1329 in Industrial#33of 101 in Nepal#701of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a 100% usage-rate assumption, a project-specific baseline with no stated reassessment, no buffer pool, and a roughly 9× over-delivery of verified emissions reductions relative to the pro-rata ex-ante expectation. Multiple corrective actions and contradictions across documents further erode confidence in the data quality.
Red Flags
- Verified ERR of 87,941 is approximately 919% of the pro-rata ex-ante expectation (47,855 lifetime estimate ÷ 5-year crediting period × 1-year monitoring period ≈ 9,571), indicating a very large over-delivery that warrants scrutiny of the ex-ante estimate or the verified figure.
- Usage rate assumed and verified at 100%, which is an extremely aggressive assumption for household cookstove adoption and use in rural Nepal; the PDD lists a value of 1.0, creating a unit or interpretation ambiguity.
- No buffer pool is stated in any available document, leaving no financial or credit-based protection against potential reversal (e.g., stove replacement or abandonment).
- FPIC status is contradictory: the earlier validation report (Nov 2023) records it as conducted, while the later validation report (Sep 2024) records it as not conducted.
- Seven corrective action requests and six forward action requests were raised during verification, including issues with leakage calculation transparency, non-conservative vintage dating, and SDG reporting errors.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 6,811 | 0 | 6,811 | |
| 2024 | 2,375 | 0 | 2,375 | |
| Total | 9,186 | 0 | 9,186 |
Risk Indicators
VVB-confirmed combined test
cookstove replacement risk
5% quantified deduction applied
Project-specific; reassessment timing not stated
Grievance mechanism present; FPIC not conducted (per latest validation)
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →