GS11935 GS11934 RVPA-15 Promoting sustainable use of biomass energy resources in targeted communities
GS-4691 ↗ · current registry ID: GS12714
#606of 1329 in Industrial#62of 101 in Nepal#932of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by an aggressive 100% usage-rate assumption, absence of a buffer pool, a contradictory FPIC record, and no monitoring-period data to verify actual delivery. The low extraction confidence and multiple cross-document inconsistencies (several of which are unit-conversion artefacts) reduce confidence in the underlying data.
Red Flags
- Usage rate assumed at 100% with no verified usage rate reported in any available document — a significant over-crediting risk for a domestic cookstove project
- FPIC status is contradictory: the 2023 validation report states FPIC was conducted, while the more recent 2024 validation report states it was not; the 2024 value is privileged
- Total ERR claimed equals total ERR verified (47,333 tCO₂e) with no monitoring period or monitoring report identified, suggesting the 'verified' figure is simply the validation estimate repeated rather than independently monitored
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 6,376 | 0 | 6,376 | |
| 2024 | 2,349 | 0 | 2,349 | |
| Total | 8,725 | 0 | 8,725 |
Risk Indicators
VVB-confirmed combined test
reversion risk unaddressed
5% quantified deduction with justification
Project-specific baseline; reassessment timing not stated
Grievance mechanism present; FPIC not conducted per 2024 report
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →