GS11935 GS11934 RVPA-16 Promoting sustainable use of biomass energy resources in targeted communities
GS-4692 ↗ · current registry ID: GS12715
#677of 1329 in Industrial#69of 101 in Nepal#1026of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a 100% usage-rate assumption, absence of a buffer pool, a direct contradiction on whether FPIC was conducted, and no monitoring data yet available. The project is in its early crediting period (2023–2028) and the documentation record shows multiple initial gaps that were subsequently closed, but the low extraction confidence and missing monitoring period limit confidence in the current evidence base.
Red Flags
- FPIC contradiction: the 2024-09-27 validation report states FPIC was NOT conducted, while an earlier 2023-11-30 validation report states it WAS conducted — the more recent document is privileged, leaving a safeguards gap
- 100% usage-rate assumption for cookstoves is highly aggressive and no verified usage rate has been reported to date
- Total ERR claimed (47,306 tCO2e) exactly equals total ERR verified, with no monitoring period stated — this suggests no independent monitoring has yet been performed
- Low extraction confidence across the document set reduces reliability of the structured evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 6,165 | 0 | 6,165 | |
| 2024 | 2,348 | 0 | 2,348 | |
| Total | 8,513 | 0 | 8,513 |
Risk Indicators
VVB-confirmed combined test
reversal risk unaddressed
5% quantified deduction with justification
Project-specific baseline; no reassessment date
Grievance mechanism present; FPIC not conducted per latest report
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →