Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-19 Promoting sustainable use of biomass energy resources in targeted communities

GS-4695 ↗ · current registry ID: GS12718

#501of 1329 in Industrial#42of 101 in Nepal#799of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence safeguards (no buffer pool stated), a project-specific baseline without documented reassessment, and an unresolved FPIC contradiction between validation report versions. The absence of any monitoring-period data and low extraction confidence limit confidence in the project's ongoing performance.

Red Flags

  • FPIC status contradicts between two validation report versions (true in Nov 2023, false in Sep 2024) — the more recent document indicates FPIC was not conducted
  • 100% usage rate assumed with no verified usage data to support the claim
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable
  • No monitoring period or monitoring report found despite the crediting period starting in May 2023

Credit Vintages

IssuedRetiredAvailable
2023
5,57505,575
2024
2,34902,349
Total7,92407,924

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversal data

Leakage

5% quantified deduction

Baseline

Project-specific; no reassessment date

Safeguards

Grievance mechanism present; FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents