GS11935 GS11934 RVPA-28 Promoting sustainable use of biomass energy resources in targeted communities
GS-4704 ↗ · current registry ID: GS12728
#871of 1329 in Industrial#84of 101 in Nepal#1287of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a 2010-dated project-specific baseline, an aggressive 100% usage-rate assumption, no buffer pool, and a contradiction on whether FPIC was conducted. The low extraction confidence and multiple inter-document discrepancies (fNRB units, crediting period, usage rate) reduce confidence in the underlying data.
Red Flags
- Usage rate assumed at 100% in the validation report versus 1 in an appendix — a factor-of-100 discrepancy that, if the lower value is correct, would reduce the ERR by two orders of magnitude
- fNRB value appears as 91.44 in the validation report but 0.9144 in the PDD — a factor-of-10 unit discrepancy that could inflate or deflate the ERR by an order of magnitude
- FPIC status contradicts itself: the 2023 validation report states FPIC was conducted, while the 2024 validation report states it was not
- Baseline survey dates from 2010, flagged by the CME as potentially irrelevant for current firewood consumption patterns, yet no updated baseline was provided
- No buffer pool or permanence mechanism is documented, and reversal events are explicitly not addressed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 4,461 | 0 | 4,461 | |
| 2024 | 2,347 | 0 | 2,347 | |
| Total | 6,808 | 0 | 6,808 |
Risk Indicators
VVB-confirmed combined test
reversal not addressed
5% quantified deduction
Project-specific; 2010 survey flagged by CME
Grievance mechanism present; FPIC not conducted per 2024 report
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →