GS11935 GS11934 RVPA-34 Promoting sustainable use of biomass energy resources in targeted communities
GS-4710 ↗ · current registry ID: GS12734
#505of 1329 in Industrial#46of 101 in Nepal#803of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence safeguards (no buffer pool, reversal events unaddressed), an aggressive 100% usage-rate assumption, and multiple cross-document contradictions in key parameters. The low extraction confidence and absence of a monitoring report limit confidence in the overall data picture.
Red Flags
- Usage rate assumed at 100% in the validation report, with a contradictory value of 1 in an undated source — an aggressive assumption that inflates claimed reductions if actual adoption or usage is lower
- Reversal events are explicitly 'not addressed' and no buffer pool percentage is stated, leaving permanence risk unquantified for a project where stoves can be replaced or fall out of use
- Total ERR discrepancy: 46,386 tCO2e in the validation report vs 51,404 in an undated source — a ~10% gap that is unexplained
- fNRB value appears as 91.44 in the validation report and 0.9144 in the PDD — a factor-of-100 difference that is likely a unit error but undermines data reliability
- Min extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing trust in the extracted figures
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 3,137 | 0 | 3,137 | |
| 2024 | 2,284 | 0 | 2,284 | |
| Total | 5,421 | 0 | 5,421 |
Risk Indicators
VVB-confirmed combined test
reversals unaddressed
5% quantified deduction
Project-specific; reassessment not stated
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →