GS11935 GS11934 RVPA-41 Promoting sustainable use of biomass energy resources in targeted communities
GS-4717 ↗ · current registry ID: GS12741
#359of 1329 in Industrial#28of 101 in Nepal#580of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with a verified combined additionality test and a quantified 5% leakage deduction, but significant gaps in permanence safeguards (no buffer pool, reversal risk unaddressed), an aggressive 100% usage-rate assumption, and contradictory records on FPIC and usage rates. The project relies on a project-specific baseline and a national-default fNRB, and no monitoring-period data is available to validate the ex-ante emission reduction estimate.
Red Flags
- No buffer pool or permanence mechanism is stated in any available document, leaving reversal risk (stove breakage, replacement with inefficient units) unmitigated
- Usage rate assumed at 100% in the validation report, contradicted by an appendix value of 1 — a discrepancy that materially affects the 47,273 tCO2e claim
- FPIC status is contradictory: the 2024 validation report states it was not conducted, while an earlier 2023 validation report states it was conducted
- Reversal events are explicitly 'not addressed' in the extracted record, with no buffer pool or credit retirement mechanism documented
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and data reliability is compromised
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 2,422 | 0 | 2,422 | |
| 2024 | 2,320 | 0 | 2,320 | |
| Total | 4,742 | 0 | 4,742 |
Risk Indicators
Combined test verified by VVB
reversal unaddressed
5% quantified deduction
Project-specific; reassessment date not stated
Grievance mechanism present; FPIC contradictory
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →