GS11935 GS11934 RVPA-49 Promoting sustainable use of biomass energy resources in targeted communities
GS-4725 ↗ · current registry ID: GS12749
#510of 1329 in Industrial#51of 101 in Nepal#808of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but weakened by the absence of a buffer pool, a project-specific baseline, and a contradictory FPIC record. No monitoring data is available to verify actual delivery against the 47,333 tCO2e lifetime claim, and the 100% usage-rate assumption is aggressive. The validation process was thorough (all corrective actions closed), but low extraction confidence and missing monitoring reports limit confidence in the overall record.
Red Flags
- FPIC status contradicts between two validation reports (true in Nov 2023, false in Sep 2024); the more recent report indicates FPIC was not conducted
- No buffer pool is documented for a project where cookstove breakage or replacement with inefficient units creates reversal risk
- 100% usage rate assumed with no verified usage data available to confirm the assumption
- No monitoring report found in the extracted record; total_err_verified equals total_err_claimed (47,333 tCO2e), suggesting the 'verified' figure is the validation estimate rather than an independent monitoring result
- Low extraction confidence across the document set, indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1,889 | 0 | 1,889 | |
| 2024 | 2,323 | 0 | 2,323 | |
| Total | 4,212 | 0 | 4,212 |
Risk Indicators
Combined test, VVB-confirmed
cookstove reversal risk unaddressed
5% quantified deduction
Project-specific; no reassessment date stated
Grievance mechanism present; FPIC not conducted (most recent report)
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →