GS11935 GS11934 RVPA-52 Promoting sustainable use of biomass energy resources in targeted communities
GS-4728 ↗ · current registry ID: GS12752
#511of 1329 in Industrial#52of 101 in Nepal#809of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but significant gaps in permanence protection (no buffer pool, reversal risk unaddressed), an aggressive 100% usage-rate assumption, and a concerning contradiction on FPIC status between two validation reports. The identical claimed and verified ERR figures (47,333 tCO₂e) suggest no independent monitoring verification has yet been performed.
Red Flags
- FPIC status contradicts between two validation reports: the 2023-11-30 report states FPIC was conducted, while the more recent 2024-09-27 report states it was not — a material safeguard gap
- Total ERR claimed and verified are identical (47,333 tCO₂e), indicating no independent monitoring-period verification has been completed
- No buffer pool percentage is stated and reversal events are explicitly 'not addressed' — permanence risk for cookstove assets is unmitigated
- Usage rate assumed at 100% with no verified usage rate available — an aggressive assumption for household cookstove adoption
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 1,031 | 0 | 1,031 | |
| 2024 | 2,344 | 0 | 2,344 | |
| Total | 3,375 | 0 | 3,375 |
Risk Indicators
VVB-confirmed combined test
reversal unaddressed
5% quantified deduction
Project-specific; reassessment timing not stated
Grievance mechanism present; FPIC not conducted (2024 report)
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →