Skip to main content
GSEnergy Efficiency - DomesticNepalGeneral Methodologyv2.1

GS11935 GS11934 RVPA-54 Promoting sustainable use of biomass energy resources in targeted communities

GS-4730 ↗ · current registry ID: GS12754

#513of 1329 in Industrial#54of 101 in Nepal#811of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A Gold Standard cookstove efficiency project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a project-specific baseline with no reassessment record, unaddressed permanence/reversal risk, and significant contradictions in key parameters (usage rate, fNRB, FPIC status). The 100% assumed usage rate and identical claimed/verified ERR figures raise over-crediting concerns, while low extraction confidence and multiple forward action requests indicate documentation gaps.

Red Flags

  • Usage rate contradiction: validation report states 100% assumed usage while an appendix states 1% — a 100× discrepancy that directly affects credit quantity
  • fNRB value contradiction: validation report lists 91.44 while the PDD lists 0.9144 — likely a unit or decimal error that could inflate or deflate credits by 100×
  • FPIC contradiction: validation report confirms FPIC was conducted, but the PDD (dated 2024-09-13) states it was not — a fundamental safeguards discrepancy
  • Permanence and reversal risk explicitly 'not addressed' in available documents, with no buffer pool percentage stated
  • Total ERR claimed and verified are identical (47,333 tCO2e), with no independent monitoring-period verification apparent

Credit Vintages

IssuedRetiredAvailable
2023
7470747
2024
2,34502,345
Total3,09203,092

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

5% quantified deduction

Baseline

Project-specific, no reassessment record

Safeguards

FPIC contradiction, grievance mechanism present

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents