GS11935 GS11934 RVPA-58 Promoting sustainable use of biomass energy resources in targeted communities
GS-4734 ↗ · current registry ID: GS12758
#445of 1329 in Industrial#36of 101 in Nepal#704of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove project in Nepal with VVB-confirmed additionality and a quantified 5% leakage deduction, but undermined by a significant FPIC contradiction (the most recent validation report states FPIC was not conducted), no stated buffer pool, multiple unresolved corrective actions, and a low extraction confidence that limits assurance across all dimensions. The ERR figures are internally consistent once the annual-versus-lifetime basis is reconciled, but the absence of a monitoring report and CORSIA/CCP status leaves claim safety partially unverified.
Red Flags
- FPIC contradiction: the 2024-09-27 validation report states FPIC was NOT conducted, while the earlier 2023-11-30 validation report states it was; the more recent document is privileged, leaving a safeguard gap
- Six corrective action requests remain open, including clarification of the grievance mechanism location and demonstration of no double counting
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and reducing overall data reliability
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 262 | 0 | 262 | |
| 2024 | 2,383 | 0 | 2,383 | |
| Total | 2,645 | 0 | 2,645 |
Risk Indicators
VVB-confirmed combined test
cookstove project has lower inherent risk
5% quantified deduction with justification
Project-specific baseline; reassessment timing not stated
FPIC not conducted per most recent validation report
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →