GS1247 VPA 100 Improved Kitchen Regimes Multi-Country PoA - Kasungu Boreholes, Malawi
GS-1476 ↗ · current registry ID: GS5340
#66of 1329 in Industrial#10of 92 in Malawi#156of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard improved cookstove project in Malawi with VVB-confirmed additionality and consistent usage-rate data, but weakened by a project-specific baseline, a 0% leakage deduction with contradictory justifications across documents, self-reported monitoring, and nine inter-document contradictions that raise data-reliability concerns. No verified ERR figure was found in the extracted record, limiting the ability to confirm over- or under-delivery.
Red Flags
- Nine contradictions between documents (leakage justification, usage rate, FNRB method, crediting period, monitoring method, etc.) indicate inconsistent data management across the project's reporting cycle.
- Leakage deduction is 0% with the verification report calling it 'quantified' while the more recent monitoring report calls it 'deemed negligible' — the basis for the zero deduction is unclear.
- Total verified ERR is not found in the extracted record, so the claimed 99,056 tCO₂e cannot be independently cross-checked against a verified figure.
- Usage monitoring is described as self-reported in the verification report but as an annual survey in the monitoring report, creating ambiguity about the actual data-collection method.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 8,877 | 8,877 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 10,000 | 0 | 10,000 | |
| 2019 | 10,000 | 8,723 | 1,277 | |
| 2020 | 9,435 | 9,435 | 0 | |
| 2021 | 9,229 | 9,045 | 184 | |
| 2022 | 9,892 | 9,696 | 196 | |
| 2023 | 693 | 680 | 13 | |
| Total | 68,126 | 56,456 | 11,670 |
Risk Indicators
VVB-confirmed combined test
Energy efficiency – no sequestration risk
0% deduction, contradictory justification
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →