Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 11 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda

GS-1500 ↗ · current registry ID: GS3306

#764of 1329 in Industrial#57of 139 in Rwanda#1152of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
5.0
Transparency
5.0
Claim Safety
4.0
Documentation
4.5

Audit Analysis

This Gold Standard VPA project (borehole rehabilitation in Gatsibo District, Rwanda) has a verified additionality assessment and no reported reversal events, but is undermined by eleven cross-document contradictions—including conflicting leakage deductions, fNRB values, and ERR figures—along with an extensive list of open corrective actions and forward action requests. The absence of a stated buffer pool and the project-specific baseline further weaken the integrity profile, while the methodology fit (thermal energy displacement applied to a borehole project) raises structural concerns.

Red Flags

  • Eleven contradictions across documents, including leakage deduction of 0% (2021 monitoring report) versus 5% (2023 PDD), and fNRB of 0.98 versus 0.85, indicating inconsistent quantification of emission reductions
  • Verified ERR of 234,127 tCO2e (2019 monitoring report) versus claimed ERR of 29,460 tCO2e (2021 monitoring report) — a roughly 8-fold difference that, while from different periods, signals significant uncertainty in the ex-ante estimate
  • Project name references a borehole project but the methodology is 'Technologies and Practices to Displace Decentralized Thermal Energy Consumption' (v.4.0), raising questions about methodological fit
  • Dozens of open corrective actions and forward action requests remain unresolved, including SDG indicator evaluation, fNRB reporting at VPA level, and monitoring option justification

Credit Vintages Exhausted

IssuedRetiredAvailable
2014
1,5321,5320
2015
10,13110,1310
2016
10,02710,0270
2017
9,9439,9430
2018
9,9679,9670
2019
5,5365,5360
2020
4,3774,3770
2021
4254250
Total51,93851,9380

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction contradicted by 5% in PDD

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA not stated; CCP not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents