Vai al contenuto principale
GS Energy Efficiency - Domestic Rwanda Documentazione completa General Methodology v2.0

GS1247 VPA 110 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-973 ↗

5.2 / 10
Integrity
5.2
Transparency
5.6
Claim Safety
5.0
Documentation
5.1

Score Breakdown

Integrity

verified The monitoring report states a quantified leakage treatment with a 0% deduction and no reversal events reported in the latest document.

missing Additionality is not evidenced in the extracted record, and no buffer pool percentage is stated; the report also includes a forward action request to monitor borehole operating status and non-available days.

Transparency

verified The project has a named monitoring period and a documented annual survey approach for usage monitoring, with the Gold Standard registry identified.

missing The VVB name and verified ER total are not found in the available documents, and the record contains contradictions on usage rates and claimed ERs between monitoring documents.

Claim Safety

verified Usage was verified at 90% in the later monitoring report, and leakage was explicitly quantified at 0%.

missing The baseline is project-specific rather than a clearly standardized or recently reassessed baseline, and the project is not shown to be CCP-approved or explicitly outside CORSIA eligibility.

Documentation

verified Two official document types were used, and the extraction confidence is high.

missing The documentation is incomplete on several core items, including the VVB name, buffer pool, and verified ER total, and the crediting period differs between the PDD and monitoring report.

Detailed Analysis

Integrity

The monitoring report shows a quantified leakage deduction of 0% and says no reversal events were reported, which supports some integrity. However, additionality is not documented in the extracted record, the buffer pool percentage is not stated, and the report includes a forward action request to monitor borehole operating status and non-available days, which weakens confidence in permanence and monitoring robustness.

Transparency

Transparency is moderate because the project documents identify the Gold Standard registry, the monitoring period, and an annual survey for usage monitoring. That said, the VVB name is not found in the extracted record, the verified ER total is not available, and the record contains contradictions on usage rates and claimed ERs across monitoring documents, which reduces clarity and auditability.

Claim Safety

Claim safety is mixed. The later monitoring report verifies a 90% usage rate and reports a 0% leakage deduction, but the baseline is project-specific and not shown to be recently reassessed, and the project is not clearly shown to be CCP-approved or excluded from CORSIA-related claims. The contradictions on usage assumptions and ER totals increase over-crediting risk.

Documentation

Documentation quality is fair but incomplete. Two official document types were used and extraction confidence is high, yet several important fields are missing, including the VVB name, buffer pool, and verified ER total. The crediting period also differs between the PDD and the monitoring report, which suggests the documentation set is not fully consistent.

Overall

Overall, this is a mid-quality project with some solid monitoring and safeguard features, but important gaps remain in additionality, permanence, and documentation completeness. I privileged the later monitoring report dated 2021-02-17 over the earlier 2020-06-04 and 2017-10-19 documents for usage rate, claimed ERs, and reversal status because it is the most recent source, but the contradictions still lower reliability. The differing crediting period dates between the PDD and monitoring report were treated as a documentation inconsistency rather than a substantive project failure, though they do reduce confidence.

Audit Analysis

The project has some positive safeguards and monitoring elements, but key robustness items are missing or only partially documented. The biggest concerns are the lack of a clearly stated additionality test, no buffer pool information, and contradictions between documents on usage rates, claimed ERs, reversal reporting, and crediting period dates.

Project Description

Developer: CO2balance UK ltd Type: Energy Efficiency - Domestic Size: Micro Scale Methodology: GS TPDDTEC v 1. Crediting period: 2016-08-17 → 2023-08-16 Estimated annual credits: 10000 tCO2e SDGs: Goal 13: Climate Action, Goal 6: Clean Water and Sanitation, Goal 3: Good Health and Well-Being, Goal 5: Gender Equality

Red Flags

  • No additionality test type or VVB confirmation is stated in the extracted record.
  • Contradictions exist on usage rates, claimed emission reductions, reversal reporting, and crediting period dates across documents.

Credit Vintages

Issued Retired Available
2016
3,267 3,267 0
2017
9,917 9,917 0
2018
9,917 9,917 0
2019
8,269 7,934 335
2020
2,568 2,568 0
Total 33,938 33,603 335

Cosa migliorerebbe questo punteggio

  • Provide a clear additionality assessment and, if applicable, VVB confirmation of the test used.
  • Disclose the buffer pool arrangement, verified ER totals, and a reconciliation of the contradictory usage, reversal, and crediting-period figures.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence found

Permanence

No reversals reported, but buffer pool missing

Leakage

Leakage quantified at 0%

Baseline

Project baseline, reassessment not stated

Safeguards

FPIC and grievance mechanism documented

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti