A Gold Standard community borehole project in Eritrea with verified additionality and a recently reassessed baseline, but lacking a buffer pool for a project type with inherent equipment-failure risk. Multiple corrective actions remain open from the 2024 verification, and the verified ERR figure is absent from the extracted record, limiting the ability to confirm over- or under-delivery. The project is in a transition between crediting periods, with a new validation completed in 2025.

Red Flags

  • No buffer pool is in place despite the project's inherent reversal risk (borehole breakdowns), and the verification report marks reversal events as 'not addressed' rather than explicitly confirming none occurred
  • Eight compliance-level findings and five corrective action requests were raised in the 2024 verification, with several forward action items (downtime reporting, duplication checks, dry-season WCFT) still pending at the next verification
  • The verified ERR figure is not present in the extracted record, preventing a pro-rata comparison against the 79,172 tCO₂e claimed for the 2023–2024 monitoring period
  • The FNRB method is contradictory across documents: the 2024 verification report states 'national default' while the 2023 PDD states 'local field' measurement

Credit Vintages

IssuedRetiredAvailable
2017
4,7624,7620
2018
10,00010,0000
2019
10,1257,5442,581
2020
5,2715,22942
2021
6,4783,6632,815
2022
5,8591,5484,311
2023
4,00004,000
2024
1850185
Total46,68032,74613,934

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk unaddressed in verification

Leakage

0% deduction with quantified justification; no buffer margin

Baseline

Project-specific baseline; reassessed 2024; FNRB method contradictory

Safeguards

FPIC conducted; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents