Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 154 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda

GS-1446 ↗ · current registry ID: GS6789

#89of 1329 in Industrial#7of 139 in Rwanda#192of 1801 in Gold Standard (GS)

5.9/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
5.5
Documentation
6.0

Audit Analysis

A Gold Standard improved cookstove project in Rwanda with VVB-confirmed additionality and no reversal events, but weakened by the absence of a buffer pool, a thin 0% leakage justification for a behavioral project, and several cross-document contradictions on FNRB values and crediting periods. The verified ERR exceeds the claimed figure, suggesting conservative initial estimates, though the basis of comparison is unclear without a lifetime ex-ante figure.

Red Flags

  • Leakage deduction of 0% justified only as 'deemed negligible' in the 2020 monitoring report, while the 2019 monitoring report described it as 'quantified' — an inconsistency that weakens the justification for a project where household behavioral reversion is a realistic risk
  • FNRB value contradicts between documents: 0.98 (national default, 2020 monitoring report) vs 0.85 (local field, 2023 PDD) — the more recent PDD value is lower and more rigorous, but the monitoring report used the higher value
  • Two different crediting periods appear across documents (2014–2021 in the 2020 monitoring report vs 2025–2030 in the 2025 validation report), creating ambiguity about which period the monitoring data applies to

Credit Vintages Exhausted

IssuedRetiredAvailable
2017
8,7338,7330
2018
9,3399,3390
2019
5,5115,5110
2020
4,3884,3880
2021
4254250
Total28,39628,3960

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction, thin justification

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA and CCP unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents