GS1247 VPA 155 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda

GS-1504 ↗

4.6 / 10
Integrity
4.4
Transparency
4.8
Claim Safety
4.2
Documentation
5.1

Score Breakdown

Integrity

verified The monitoring report reports no material findings and no corrective actions required.

missing Additionality is not documented in the extracted record, and reversal risk is not addressed.

Transparency

verified The monitoring period is clearly stated, and the report includes quantified usage monitoring through an annual survey.

missing Total verified and claimed emission reductions are not stated, and the VVB name is not found in the available documents.

Claim Safety

verified The monitoring report states a quantified leakage treatment and a verified usage rate of 100% against an assumed 80%.

missing The baseline method is not stated, and the project is not shown to be excluded from CORSIA or CCP channels.

Documentation

verified Two document types were used, and extraction confidence is high.

missing The crediting period is inconsistent across documents, and the baseline last reassessment date is not stated.

Detailed Analysis

Integrity

The monitoring report states no material findings and no corrective actions required, which is positive for implementation quality. However, additionality is not evidenced in the extracted record because no test type or VVB confirmation is stated, and reversal events are noted as not addressed. The absence of a buffer pool figure also weakens permanence confidence.

Transparency

The monitoring period is clearly defined as 2019-02-06 to 2020-02-05, and usage monitoring is described as an annual survey. Still, the extracted record does not provide total claimed or verified emission reductions, and the VVB name is not found. That limits public traceability and makes the MRV package only moderately transparent.

Claim Safety

Claim safety is helped by the reported 100% verified usage rate and the stated quantified leakage treatment, which suggests some effort to control over-crediting. But the baseline method is not stated, and the project’s CORSIA eligibility and CCP status are not clearly resolved in the available record. The assumed 80% usage rate versus 100% verified usage also raises questions about how conservatively the baseline was set.

Documentation

The record draws on a PDD and a monitoring report, and extraction confidence is high, which supports basic documentation quality. However, the crediting period is contradictory: the monitoring report gives 2014-11-06 to 2024-02-05, while the PDD gives 2017-02-05 to 2024-02-05. I privileged the monitoring report because it is the more recent document and likely reflects the latest project status, but the inconsistency still lowers reliability. The baseline last reassessment date is also not stated.

Overall

Overall, this is a moderately documented project with some positive operational safeguards, but the evidence base is thin on core carbon-quality questions. The contradiction on the crediting period is material: I privileged the monitoring report because it is newer and more operationally specific, but the mismatch with the PDD reduces confidence in the record. Because additionality, baseline, and permanence are not well evidenced, the project scores only mid-range.

Audit Analysis

The project has some positive safeguards and monitoring features, but key elements of additionality, baseline design, and permanence are not well evidenced in the extracted record. The crediting period discrepancy between the monitoring report and the PDD reduces confidence in the documentation and suggests the record is not fully consistent.

Project Description

Developer: Deactivated Projects Type: Energy Efficiency - Domestic Size: Micro Scale Methodology: GS TPDDTEC v 2. Crediting period: 2017-02-05 → 2024-02-04 Estimated annual credits: 10000 tCO2e SDGs: Goal 13: Climate Action, Goal 3: Good Health and Well-Being, Goal 5: Gender Equality, Goal 6: Clean Water and Sanitation

Red Flags

  • No additionality test or VVB confirmation is stated in the extracted documents.
  • The crediting period differs between the monitoring report and the PDD, creating a reliability concern.

Credit Vintages Exhausted

Issued Retired Available
2017
8,984 8,984 0
2018
9,997 9,997 0
2019
5,393 5,393 0
2020
4,365 4,365 0
2021
425 425 0
Total 29,164 29,164 0

Cosa migliorerebbe questo punteggio

  • Publish the baseline methodology, additionality test, and VVB validation details in a single consistent project record.
  • Resolve the crediting-period discrepancy and disclose verified versus claimed emission reductions, leakage deduction, and permanence provisions.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

No additionality evidence found

Permanence

Reversal risk not addressed

Leakage

Leakage treatment unclear

Baseline

Baseline method not stated

Safeguards

FPIC and grievance mechanism present

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-14 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti