Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 158 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-1438 ↗ · current registry ID: GS6838

#877of 1329 in Industrial#72of 139 in Rwanda#1293of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This Gold Standard borehole water-supply project under the Improved Kitchen Regimes PoA has confirmed additionality (combined test, VVB-verified) and no reversal events, but is significantly undermined by 11 documented contradictions across key parameters, the absence of any verified ERR figure, an over-crediting cap issue that forced redistribution of boreholes into new VPAs, and 40+ outstanding corrective actions. The project's energy-efficiency nature limits permanence risk, yet the data-reliability problems and unresolved monitoring gaps make it difficult to confirm that claimed reductions are accurately quantified.

Red Flags

  • 11 contradictions across ERR, fNRB, leakage, usage rate, crediting period, and benefit-sharing between the PDD, monitoring reports, and validation report
  • No verified ERR figure is available in the extracted record (total_err_verified not stated), preventing any cross-check of claimed reductions
  • Material finding: design change required to redistribute boreholes into new VPAs (GS5394, GS6837, GS6838) to address over-crediting caps
  • 5 open FARs (SDG indicators at VPA level, fNRB report, monitoring-option justification) and 40+ corrective actions remain unresolved
  • Benefit sharing was described in the 2020 monitoring report but is absent from the 2023 PDD, raising questions about social-impact continuity

Credit Vintages

IssuedRetiredAvailable
2017
2,5212,5210
2018
10,00010,0000
2019
8,3317,876455
2020
2,5682,5680
Total23,42022,965455

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Energy-efficiency project, no reversals

Leakage

Inconsistent: 0% vs 5% across documents

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents