Skip to main content
GSEnergy Efficiency - DomesticMozambiqueGeneral Methodologyv2.1

GS1247 VPA 159 Improved Kitchen Regimes Manica Province Safe Water (Mozambique)

GS-1417 ↗ · current registry ID: GS7132

#521of 1329 in Industrial#12of 51 in Mozambique#819of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

This Gold Standard kitchen-improvement project in Mozambique has a VVB-confirmed additionality assessment and a recently reassessed (2024) project-specific baseline, but suffers from a 0% leakage deduction with inconsistent justification across documents, no stated buffer pool, unresolved material findings (missing survey signatures, incomplete borehole records), and a low extraction confidence that undermines data reliability. The absence of a verified ERR figure and the lack of an ex-ante lifetime estimate prevent a meaningful over- or under-delivery check.

Red Flags

  • Total ERR verified is not stated in any available document, preventing independent verification of claimed reductions
  • Leakage deduction of 0% is justified as 'deemed negligible' in the verification report but described as 'quantified' in the 2024 monitoring report — the two characterisations are inconsistent
  • Three corrective actions remain open (surveyor/interviewee signatures, water transport evidence, borehole details), indicating monitoring data quality issues
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the extracted record may be incomplete

Credit Vintages

IssuedRetiredAvailable
2019
2,4402,4400
2020
8,6336,9891,644
2021
6,5172,6703,847
2022
9,79109,791
2023
9,7644,6795,085
2024
4,56004,560
Total41,70516,77824,927

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal risk low for EE but unquantified

Leakage

0% deduction, justification inconsistent across documents

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing described

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-10General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents