GS1247 VPA 159 Improved Kitchen Regimes Manica Province Safe Water (Mozambique)
GS-1417 ↗ · current registry ID: GS7132
#521of 1329 in Industrial#12of 51 in Mozambique#819of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard kitchen-improvement project in Mozambique has a VVB-confirmed additionality assessment and a recently reassessed (2024) project-specific baseline, but suffers from a 0% leakage deduction with inconsistent justification across documents, no stated buffer pool, unresolved material findings (missing survey signatures, incomplete borehole records), and a low extraction confidence that undermines data reliability. The absence of a verified ERR figure and the lack of an ex-ante lifetime estimate prevent a meaningful over- or under-delivery check.
Red Flags
- Total ERR verified is not stated in any available document, preventing independent verification of claimed reductions
- Leakage deduction of 0% is justified as 'deemed negligible' in the verification report but described as 'quantified' in the 2024 monitoring report — the two characterisations are inconsistent
- Three corrective actions remain open (surveyor/interviewee signatures, water transport evidence, borehole details), indicating monitoring data quality issues
- Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the extracted record may be incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 2,440 | 2,440 | 0 | |
| 2020 | 8,633 | 6,989 | 1,644 | |
| 2021 | 6,517 | 2,670 | 3,847 | |
| 2022 | 9,791 | 0 | 9,791 | |
| 2023 | 9,764 | 4,679 | 5,085 | |
| 2024 | 4,560 | 0 | 4,560 | |
| Total | 41,705 | 16,778 | 24,927 |
Risk Indicators
VVB-confirmed combined test
reversal risk low for EE but unquantified
0% deduction, justification inconsistent across documents
Project-specific baseline, reassessed 2024
FPIC conducted, grievance mechanism present, benefit sharing described
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →