GS1247 VPA 180 Zoba Debub Community Boreholes

GS-1524 ↗ · current registry ID: GS7334

#1058of 1329 in Industrial#35of 38 in Eritrea#1500of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
3.5

Audit Analysis

A community borehole project in Eritrea with verified additionality and no reversal events, but undermined by a significant baseline test anomaly (kerosene-contaminated BWBT), a usage-rate inconsistency (95% verified vs. 90% cap), contradictory leakage justifications across documents, and a large volume of unresolved corrective actions and forward action requests spanning multiple verification cycles.

Red Flags

  • Baseline Water Boiling Test was originally conducted with kerosene, producing an anomalous value of 0.3 kg; the corrected value of 0.8892 kg (3× higher) required re-bundling of VPAs 65–70 into seven new VPAs (176–182) to manage credit overage, indicating the original credit volume was materially misstated.
  • Usage rate of 95% is reported as both assumed and verified in the 2024 verification report, yet the material findings record a cap of 90% due to BAMG changes — a direct inconsistency that inflates claimed reductions.
  • Leakage deduction is 0% in the 2024 verification report (justified as 'deemed negligible') but the PDD (2023) specified a 5% deduction and the monitoring report describes leakage as 'quantified' — the three documents are mutually inconsistent.
  • GPS coordinates for one borehole initially appeared to fall in Ethiopia rather than Eritrea; resolved only after mapping evidence was provided, raising questions about site boundary integrity.
  • Multiple open Forward Action Requests (FAR 01–05) and recurring Corrective Actions across at least three verification cycles indicate persistent documentation and monitoring gaps.

Credit Vintages

IssuedRetiredAvailable
2017
1,8631,8630
2018
10,0006,9893,011
2019
7,4875,6441,843
2020
3,8823,85230
2021
4,6262,6152,011
2022
4,4341,1063,328
2023
3,2851,4861,799
2024
2770277
Total35,85423,55512,299

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals but no permanence safeguard recorded

Leakage

0% deduction with contradictory justifications across documents

Baseline

Project-specific baseline; BWBT anomaly corrected; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents