Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 203 Sierra Leone Safe Water

GS-1861 ↗ · current registry ID: GS7475

#612of 1329 in Industrial#5of 16 in Sierra Leone#938of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

This Gold Standard safe-water project in Sierra Leone displaces thermal energy used for boiling water and has VVB-confirmed additionality with no reversal events, but is burdened by an extraordinary volume of material findings, open corrective actions, significant borehole operational failures (4,193 non-functional days), a declining usage rate, and multiple data contradictions across documents. The absence of a buffer pool, a 0% leakage deduction with inconsistent justification, and a project-specific baseline further weaken the integrity profile. Overall, the project is verified but operationally fragile and data-inconsistent.

Red Flags

  • 4,193 borehole non-functional days across VPAs during the monitoring period due to low water discharge and broken pump heads, indicating significant operational fragility
  • Usage rate declined from 93.98% to 81.73% between monitoring periods, undermining the assumed 90–95% utilisation
  • Leakage deduction is 0% yet the justification is contradictory: the verification report (2024-05-29) calls it 'quantified' while the monitoring report (2024-05-18) calls it 'deemed negligible', and the PDD originally planned a 5% deduction
  • fNRB value differs by 50% between documents: 0.95 (national default, monitoring report) versus 0.63 (local field, validation report), which would materially alter credit quantities

Credit Vintages

IssuedRetiredAvailable
2019
3,0112,832179
2020
6,7666,7660
2021
6,8336,8330
2022
5,6984,4931,205
2023
2,17802,178
Total24,48620,9243,562

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals but operational fragility

Leakage

0% deduction with contradictory justification

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents