Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 212 Sierra Leone Safe Water

GS-1870 ↗ · current registry ID: GS7484

#614of 1329 in Industrial#7of 16 in Sierra Leone#940of 1801 in Gold Standard (GS)

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A Gold Standard safe-water project in Sierra Leone with VVB-confirmed additionality and no reversal events, but undermined by 4,193 borehole failure days, a declining usage rate (93.98% to 81.73%), no buffer pool, no exit strategy, and over 40 outstanding corrective actions. The project over-delivers relative to its ex-ante estimate, yet the volume of open findings and data contradictions across documents raises material concerns about long-term credit integrity.

Red Flags

  • 4,193 borehole failure days recorded across all VPAs during the monitoring period, with 4 facilities showing reduced dry-season yield
  • Usage rate declined from 93.98% to 81.73% between monitoring periods, signalling deteriorating performance
  • Lack of an exit strategy explicitly flagged as a risk to beneficiaries in the verification report
  • Over 40 corrective actions and 5 open FARs remain unresolved, including VPA-level SDG indicators and fNRB reporting

Credit Vintages

IssuedRetiredAvailable
2019
86860
2020
6,5016,382119
2021
6,9555,7641,191
2022
6,6146,483131
2023
2,76202,762
Total22,91818,7154,203

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

4,193 failure days

Leakage

0% deduction; justification inconsistent across docs

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents