GS1247 VPA 22 Improved Kitchen Regimes: Gatsibo District Borehole Project, Rwanda
GS-600 ↗ · current registry ID: GS3433
#1145of 1329 in Industrial#110of 139 in Rwanda#1598of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard cookstove and borehole project in Rwanda has a verified additionality assessment and no reported reversal events, but is undermined by a very large number of unresolved material findings and corrective actions, multiple contradictions in key quantification parameters (usage rate, fNRB, leakage), and the absence of a stated buffer pool. The verified ERR figure exceeding the claimed ERR figure raises over-crediting concerns, and the project-specific baseline with inconsistent leakage treatment limits confidence in the claimed reductions.
Red Flags
- Verified ERR (234,127 tCO₂e) exceeds the claimed ERR (118,203 tCO₂e) from the 2020 monitoring report, signalling a potential over-crediting or period-mismatch issue
- Usage rate assumption contradicts itself across documents: 90% in the 2025 PDD versus 15% in a 2022 appendix — a 75-percentage-point gap that cannot be reconciled without clarification
- Five Forward Action Requests (FAR 01–05) remain open, covering SDG indicator alignment, fNRB reporting, and monitoring justification at the VPA level
- Leakage treatment is inconsistent: the 2020 monitoring report applies a 0% deduction with a 'deemed negligible' justification, while the 2025 PDD references a 5% deduction
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 3,688 | 3,688 | 0 | |
| 2016 | 9,778 | 9,778 | 0 | |
| 2017 | 9,943 | 9,943 | 0 | |
| 2018 | 9,967 | 9,967 | 0 | |
| 2019 | 5,351 | 5,351 | 0 | |
| 2020 | 4,367 | 4,367 | 0 | |
| 2021 | 425 | 425 | 0 | |
| Total | 43,519 | 43,519 | 0 |
Risk Indicators
Combined test, VVB-confirmed
no reversals reported
0% vs 5% deduction inconsistent across documents
Project-specific baseline, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →