Skip to main content
GSEnergy Efficiency - DomesticSierra LeoneGeneral Methodologyv2.1

GS1247 VPA 232 Sierra Leone Safe Water

GS-2654 ↗ · current registry ID: GS10664

#882of 1329 in Industrial#16of 16 in Sierra Leone#1298of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
4.8
Claim Safety
4.2
Documentation
4.3

Audit Analysis

This Gold Standard safe-water/thermal-energy-displacement project in Sierra Leone has VVB-confirmed additionality and documented safeguards, but suffers from a critical absence of verified ERR figures, a 0% leakage deduction with contradictory justification, no buffer pool, and ten cross-document contradictions that undermine data reliability. The extensive list of open corrective actions and follow-up items signals ongoing compliance gaps that have not been fully resolved.

Red Flags

  • Verified ERR figure is entirely absent from the extracted record, making it impossible to confirm whether claimed reductions (86,933 tCO2e for the 2023–2024 monitoring period) are supported by independent measurement.
  • Leakage deduction is 0% in the monitoring report while the PDD originally specified 5%, and the justification is contradictory ('quantified' in the verification report vs 'deemed negligible' in the monitoring report).
  • No buffer pool percentage is stated, and the verification report marks reversal events as 'not addressed' despite the project relying on installed technology that could be replaced or abandoned.
  • Ten contradictions across documents (leakage, ERR, fNRB, usage rate, additionality test type, crediting period, benefit sharing, reversal events, fNRB method) indicate significant data-reliability issues.
  • Five follow-up actions (FAR 01–05) remain open, including the requirement to submit an fNRB report at VPA level and to justify monitoring options.

Credit Vintages

IssuedRetiredAvailable
2022
4,6971,8442,853
2023
3,53603,536
Total8,2331,8446,389

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

reversal not addressed in VR

Leakage

0% deduction; contradictory justification

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CCP and CORSIA status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents