Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1247 VPA 25 Improved Kitchen Regimes - Dowa Boreholes, Malawi

GS-534 ↗ · current registry ID: GS3106

#883of 1329 in Industrial#62of 92 in Malawi#1299of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard borehole and improved kitchen project in Malawi has VVB-verified additionality and no reversal events, but is burdened by an extraordinary volume of material findings, multiple non-functional boreholes, water quality failures, and parameter caps imposed after a grievance review. The 0% leakage deduction (contradicting the PDD's original 5%) and the project-specific baseline raise moderate concerns about the robustness of the credit claim. Documentation quality is undermined by dozens of open corrective actions, registry inconsistencies, and unresolved forward action requests.

Red Flags

  • Multiple boreholes reported non-functional or retired during 2025 (374-048, 374-082, 374-015, BORDOKA25 ran dry, BORDOKA1 offline 113 days), undermining the physical basis of claimed reductions
  • Parameter caps on Wb,y, Wp,y, usage rate, and user numbers imposed after a Gold Standard grievance review, indicating the original ex-ante values were too generous
  • Extensive list of material findings including formula errors in the ER calculation sheet, inconsistent values between the MR and ER spreadsheets, and registry methodology/SDG mislabeling
  • Leakage deduction reduced from 5% in the PDD to 0% 'deemed negligible' in the 2026 verification report without a clear methodological justification for the change
  • Negative SDG 5 impact recorded: increased time spent collecting water (75% reduction in time savings), suggesting the project is not delivering its co-benefit promise

Credit Vintages

IssuedRetiredAvailable
2013
3,8443,8440
2014
10,00010,0000
2015
10,00010,0000
2016
10,00010,0000
2017
10,0009,94852
2018
9,9739,537436
2019
9,1987,8111,387
2020
7,2007,2000
2021
6,8513,7323,119
2022
10,0009,800200
2023
9,86009,860
2024
9,59309,593
Total106,51981,87224,647

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, PDD had 5%, justification thin

Baseline

Project-specific, reassessed 2020

Safeguards

FPIC and grievance present, but safeguards section inconsistent across reports

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents