GS1247 VPA 25 Improved Kitchen Regimes - Dowa Boreholes, Malawi
GS-534 ↗ · current registry ID: GS3106
#883of 1329 in Industrial#62of 92 in Malawi#1299of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard borehole and improved kitchen project in Malawi has VVB-verified additionality and no reversal events, but is burdened by an extraordinary volume of material findings, multiple non-functional boreholes, water quality failures, and parameter caps imposed after a grievance review. The 0% leakage deduction (contradicting the PDD's original 5%) and the project-specific baseline raise moderate concerns about the robustness of the credit claim. Documentation quality is undermined by dozens of open corrective actions, registry inconsistencies, and unresolved forward action requests.
Red Flags
- Multiple boreholes reported non-functional or retired during 2025 (374-048, 374-082, 374-015, BORDOKA25 ran dry, BORDOKA1 offline 113 days), undermining the physical basis of claimed reductions
- Parameter caps on Wb,y, Wp,y, usage rate, and user numbers imposed after a Gold Standard grievance review, indicating the original ex-ante values were too generous
- Extensive list of material findings including formula errors in the ER calculation sheet, inconsistent values between the MR and ER spreadsheets, and registry methodology/SDG mislabeling
- Leakage deduction reduced from 5% in the PDD to 0% 'deemed negligible' in the 2026 verification report without a clear methodological justification for the change
- Negative SDG 5 impact recorded: increased time spent collecting water (75% reduction in time savings), suggesting the project is not delivering its co-benefit promise
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 3,844 | 3,844 | 0 | |
| 2014 | 10,000 | 10,000 | 0 | |
| 2015 | 10,000 | 10,000 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 9,948 | 52 | |
| 2018 | 9,973 | 9,537 | 436 | |
| 2019 | 9,198 | 7,811 | 1,387 | |
| 2020 | 7,200 | 7,200 | 0 | |
| 2021 | 6,851 | 3,732 | 3,119 | |
| 2022 | 10,000 | 9,800 | 200 | |
| 2023 | 9,860 | 0 | 9,860 | |
| 2024 | 9,593 | 0 | 9,593 | |
| Total | 106,519 | 81,872 | 24,647 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, PDD had 5%, justification thin
Project-specific, reassessed 2020
FPIC and grievance present, but safeguards section inconsistent across reports
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →