Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1247 VPA 263 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi

GS-2760 ↗ · current registry ID: GS10803

#372of 1329 in Industrial#38of 92 in Malawi#594of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A Gold Standard borehole project in Malawi with VVB-confirmed additionality and no reported reversal events, but undermined by the absence of a buffer pool, a 0% leakage deduction deemed negligible for a project where boreholes have already failed, a project-specific baseline, and a large volume of unresolved corrective actions. The 97.3% verified-to-claimed ERR ratio is conservative, yet 11 cross-document contradictions and a negative SDG 5 impact (29–39% increase in water-collection time) raise material concerns about the robustness of the credit claims.

Red Flags

  • Leakage deduction is 0% and 'deemed negligible' in the 2025 verification report, while the 2025 PDD originally specified a 5% deduction; for a borehole project where communities can revert to baseline water sources, the zero deduction is aggressive.
  • SDG 5 impact is reported as negative: a 29–39% increase in time spent collecting water and firewood compared to baseline, undermining the project's social-benefit narrative.
  • Eleven contradictions across documents (leakage, fNRB method, usage monitoring method, additionality test type, crediting period, and others) indicate inconsistent record-keeping and raise data-reliability concerns.
  • Five Forward Action Requests (FAR 01–05) at VPA level remain open, covering SDG indicator evaluation, fNRB reporting, and monitoring-option applicability.

Credit Vintages

IssuedRetiredAvailable
2019
3163160
2020
3,4053,3969
2021
5,7685,71355
2022
7,5617,411150
2023
9,0091,3477,662
2024
6,40406,404
Total32,46318,18314,280

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

boreholes have failed

Leakage

0% deemed negligible; PDD specified 5%

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents