GS1247 VPA 263 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi
GS-2760 ↗ · current registry ID: GS10803
#372of 1329 in Industrial#38of 92 in Malawi#594of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard borehole project in Malawi with VVB-confirmed additionality and no reported reversal events, but undermined by the absence of a buffer pool, a 0% leakage deduction deemed negligible for a project where boreholes have already failed, a project-specific baseline, and a large volume of unresolved corrective actions. The 97.3% verified-to-claimed ERR ratio is conservative, yet 11 cross-document contradictions and a negative SDG 5 impact (29–39% increase in water-collection time) raise material concerns about the robustness of the credit claims.
Red Flags
- Leakage deduction is 0% and 'deemed negligible' in the 2025 verification report, while the 2025 PDD originally specified a 5% deduction; for a borehole project where communities can revert to baseline water sources, the zero deduction is aggressive.
- SDG 5 impact is reported as negative: a 29–39% increase in time spent collecting water and firewood compared to baseline, undermining the project's social-benefit narrative.
- Eleven contradictions across documents (leakage, fNRB method, usage monitoring method, additionality test type, crediting period, and others) indicate inconsistent record-keeping and raise data-reliability concerns.
- Five Forward Action Requests (FAR 01–05) at VPA level remain open, covering SDG indicator evaluation, fNRB reporting, and monitoring-option applicability.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 316 | 316 | 0 | |
| 2020 | 3,405 | 3,396 | 9 | |
| 2021 | 5,768 | 5,713 | 55 | |
| 2022 | 7,561 | 7,411 | 150 | |
| 2023 | 9,009 | 1,347 | 7,662 | |
| 2024 | 6,404 | 0 | 6,404 | |
| Total | 32,463 | 18,183 | 14,280 |
Risk Indicators
VVB-confirmed combined test
boreholes have failed
0% deemed negligible; PDD specified 5%
Project-specific; reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →