Skip to main content
GSEnergy Efficiency - DomesticMalawiGeneral Methodologyv2.1

GS1247 VPA 264 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi

GS-2761 ↗ · current registry ID: GS10804

#769of 1329 in Industrial#55of 92 in Malawi#1157of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.8
Documentation
4.5

Audit Analysis

The Dowa Boreholes VPA under the GS1247 multi-country PoA has verified additionality and no reversal events, but is undermined by a negative SDG 5 impact (29–39% increase in water-collection time), multiple borehole failures, a 0% leakage deduction with only a 'deemed negligible' justification, and a project-specific baseline. The extensive list of material findings, open forward actions, and low extraction confidence across 42 documents signal significant data-quality and governance concerns that limit confidence in the credit claims.

Red Flags

  • SDG 5 impact is negative: the monitoring report reports a 29–38.9% increase in time spent collecting water and firewood compared to baseline, indicating the project is worsening a key social outcome for women.
  • Leakage deduction was reduced from 5% in the PDD (2023) to 0% in the 2025 verification report with only a 'deemed negligible' justification, increasing credit claims without a documented re-analysis.
  • Multiple boreholes were removed from crediting due to water quality issues or extended out-of-service periods, and deviations were approved for cholera and Cyclone Freddy, indicating operational fragility.
  • The project is classified under an energy-efficiency methodology (TPDD-TEC v3.1) and 'industrial' sector, yet the VPA delivers borehole water supply — a methodological and sectoral mismatch that raises greenwashing risk.

Credit Vintages

IssuedRetiredAvailable
2019
3313310
2020
3,5403,5400
2021
6,4226,36458
2022
7,7326,2351,497
2023
9,45409,454
2024
6,51806,518
Total33,99716,47017,527

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction, weak justification

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents