GS1247 VPA 264 Improved Kitchen Regimes Multi-Country PoA - Dowa Boreholes, Malawi
GS-2761 ↗ · current registry ID: GS10804
#769of 1329 in Industrial#55of 92 in Malawi#1157of 1801 in Gold Standard (GS)
Audit Analysis
The Dowa Boreholes VPA under the GS1247 multi-country PoA has verified additionality and no reversal events, but is undermined by a negative SDG 5 impact (29–39% increase in water-collection time), multiple borehole failures, a 0% leakage deduction with only a 'deemed negligible' justification, and a project-specific baseline. The extensive list of material findings, open forward actions, and low extraction confidence across 42 documents signal significant data-quality and governance concerns that limit confidence in the credit claims.
Red Flags
- SDG 5 impact is negative: the monitoring report reports a 29–38.9% increase in time spent collecting water and firewood compared to baseline, indicating the project is worsening a key social outcome for women.
- Leakage deduction was reduced from 5% in the PDD (2023) to 0% in the 2025 verification report with only a 'deemed negligible' justification, increasing credit claims without a documented re-analysis.
- Multiple boreholes were removed from crediting due to water quality issues or extended out-of-service periods, and deviations were approved for cholera and Cyclone Freddy, indicating operational fragility.
- The project is classified under an energy-efficiency methodology (TPDD-TEC v3.1) and 'industrial' sector, yet the VPA delivers borehole water supply — a methodological and sectoral mismatch that raises greenwashing risk.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 331 | 331 | 0 | |
| 2020 | 3,540 | 3,540 | 0 | |
| 2021 | 6,422 | 6,364 | 58 | |
| 2022 | 7,732 | 6,235 | 1,497 | |
| 2023 | 9,454 | 0 | 9,454 | |
| 2024 | 6,518 | 0 | 6,518 | |
| Total | 33,997 | 16,470 | 17,527 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, weak justification
Project-specific, reassessed 2024
FPIC, grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →