Skip to main content
GSEnergy Efficiency - DomesticBurkina FasoGeneral Methodologyv2.1

GS1247 VPA 266 - Burkina Faso Safe Water

GS-3034 ↗ · current registry ID: GS11046

#885of 1329 in Industrial#26of 33 in Burkina Faso#1301of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.0
Documentation
5.0

Audit Analysis

This Gold Standard safe-water project in Burkina Faso has confirmed additionality and no reversal events, but is undermined by an extraordinary volume of material findings (over 50), a major discrepancy between the monitoring report (4,744 tCO₂e) and the verification report (53,562 tCO₂e), a leakage deduction reduced from 5% to 0% with only a 'deemed negligible' justification, and ongoing security disruptions that have degraded monitoring quality. The project's data reliability is significantly compromised.

Red Flags

  • Over 50 material findings and corrective actions logged across verification and monitoring reports, including multiple ER calculation errors, inconsistent borehole counts (182 vs 156), and incorrect crediting-period start dates
  • Massive discrepancy in verified ERR: monitoring report (2025-03-20) reports 4,744 tCO₂e while the verification report (2025-03-30) reports 53,562 tCO₂e — an 11-fold difference that is not adequately explained
  • Leakage deduction reduced from 5% in the PDD (2023) to 0% in the 2025 verification report with only a 'deemed negligible' justification, despite the project-specific baseline and the risk of users reverting to unsafe water sources
  • Ongoing terrorist attacks, internal displacement, and roadblocks in the project area have reduced water-quality testing frequency and monitoring access, with deviations approved by Gold Standard

Credit Vintages

IssuedRetiredAvailable
2022
4,4201004,320
2023
5,31205,312
2024
2,48302,483
Total12,21510012,115

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

security risk to infrastructure

Leakage

0% deduction, weak 'deemed negligible' justification

Baseline

Project-specific baseline, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents