GS1247 VPA 269 - Burkina Faso Safe Water
GS-3037 ↗ · current registry ID: GS11049
#211of 1329 in Industrial#6of 33 in Burkina Faso#367of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard safe-water/energy-efficiency project in Burkina Faso with VVB-confirmed additionality and no reversal events, but undermined by a 0% leakage deduction that contradicts the PDD's 5% provision, a project-specific baseline, and an unusually large number of open corrective actions and forward action requests. The verified ERR matches the claimed figure exactly, yet the PDD's ex-ante estimate (10,000 tCO₂e) sits well below the verified 11,590 tCO₂e for a two-year monitoring window, raising questions about the robustness of the original estimate.
Red Flags
- Leakage deduction is 0% in the verification report while the PDD (2025-03-21) specifies a 5% deduction; the justification shifts between 'quantified' and 'deemed negligible' across documents
- Over 40 corrective actions and 5 open Forward Action Requests remain unresolved, including SDG indicator evaluation at VPA level and fNRB report submission
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- The PDD ex-ante ERR (10,000 tCO₂e) is substantially lower than the verified figure (11,590 tCO₂e) for a two-year monitoring period within a five-year crediting window, suggesting the original estimate may not have been conservative
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 26 | 20 | 6 | |
| 2023 | 7,556 | 0 | 7,556 | |
| 2024 | 3,585 | 0 | 3,585 | |
| Total | 11,167 | 20 | 11,147 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction contradicts PDD 5%
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →