GS1247 VPA 27 Improved Kitchen Regimes - Kasungu Boreholes, Malawi
GS-536 ↗ · current registry ID: GS3108
#887of 1329 in Industrial#64of 92 in Malawi#1303of 1801 in Gold Standard (GS)
Audit Analysis
This Gold Standard domestic energy-efficiency project (improved borehole water access displacing firewood use) has a VVB-verified combined additionality test and no reversal events, but is undermined by an extraordinary volume of unresolved material findings, contradictory leakage and ERR figures across documents, and a 0% leakage deduction whose justification is inconsistent between verification reports. The project's data quality and internal consistency raise meaningful concerns about the reliability of the claimed emission reductions.
Red Flags
- Leakage deduction is 0% in the April 2024 verification report, yet the PDD (March 2025) states a 5% deduction, and the justification flips between 'quantified' and 'deemed negligible' across two verification reports — the basis for the 0% figure is unclear
- Verified ERR (59,720 tCO₂e, April 2024 VR) exceeds the claimed ERR (52,581 tCO₂e, November 2024 MR), an inversion that is atypical and suggests either different reporting periods, unexplained adjustments, or data-extraction errors
- Over 50 material findings and 50+ corrective actions span multiple verification cycles, including formula errors in the ER calculation sheet, mismatched fixed ex-ante parameters versus the design document, inconsistent survey counts, and unsubmitted referenced documents
- Assumed usage rate of 0.90 (PDD) versus verified 0.7956 (monitoring report) indicates the project overestimates actual adoption by roughly 13%, inflating claimed reductions
- One borehole (BORDOKA1) was non-functional for 113 days during the monitoring period, and multiple deviations were approved due to cholera and Cyclone Freddy, indicating significant operational disruption
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 1 | 1 | 0 | |
| 2015 | 9,742 | 9,742 | 0 | |
| 2016 | 10,000 | 9,941 | 59 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 9,973 | 3,448 | 6,525 | |
| 2019 | 10,000 | 8,253 | 1,747 | |
| 2020 | 10,000 | 10,000 | 0 | |
| 2021 | 9,525 | 5,189 | 4,336 | |
| 2022 | 10,000 | 9,801 | 199 | |
| 2023 | 8,628 | 0 | 8,628 | |
| 2024 | 8,922 | 0 | 8,922 | |
| Total | 96,791 | 66,375 | 30,416 |
Risk Indicators
Combined test, VVB-verified
low inherent risk (EE)
0% deduction, contradictory justification
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing present
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →