Skip to main content
GSEnergy Efficiency - DomesticTogoGeneral Methodologyv2.1

GS1247 VPA 306 - Togo Safe Water

GS-3166 ↗ · current registry ID: GS11179

#1256of 1329 in Industrial#12of 15 in Togo#1722of 1801 in Gold Standard (GS)

3.5/ 10
Integrity
3.5
Transparency
3.5
Claim Safety
4.0
Documentation
2.5

Audit Analysis

The Togo Safe Water project (5 VPAs, borehole-based safe water supply) has confirmed additionality and no reversal events, but is severely undermined by over 50 material findings, 60+ corrective actions, and 9 cross-document contradictions affecting key parameters (leakage, fNRB, ERR, crediting period). The verified ERR of 16,591 tCO2e for a 2-year monitoring period is roughly 5× the pro-rata expectation derived from the PDD's lifetime estimate of 9,919 tCO2e, a ratio that is suspicious given documented errors in ER calculation parameters (Cj, Xboil). Low extraction confidence and numerous open Forward Action Requests further erode confidence in the project's data integrity.

Red Flags

  • Over 50 material findings in the verification report, including errors in ER calculation parameters (Cj, Xboil) and baseline Qp,y value (7.5 vs 7 L/person/day)
  • Verified ERR of 16,591 tCO2e is approximately 502% of the pro-rata expectation (3,306 tCO2e) derived from the PDD lifetime estimate of 9,919 tCO2e over a 6-year crediting period, raising over-crediting concerns
  • Leakage deduction contradicts between documents: 0% in the verification report vs 5% in the PDD, with justification shifting from 'quantified' to 'deemed negligible'
  • fNRB value contradicts: 0.87 (verification report, national default) vs 0.97 (PDD, local field) — a 12% difference that directly affects claimed reductions
  • 60+ corrective actions required, including fundamental ER calculation corrections, missing monitoring details (GPS, WQT frequency, CTF), and unresolved SDG reporting gaps

Credit Vintages

IssuedRetiredAvailable
2022
9280928
2023
6,92706,927
2024
3,79403,794
Total11,649011,649

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% vs 5% contradiction; justification inconsistent

Baseline

Project-specific; reassessed 2024; parameter errors

Safeguards

FPIC, grievance mechanism, benefit sharing present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents