Skip to main content
GSEnergy Efficiency - DomesticTogoGeneral Methodologyv2.1

GS1247 VPA 308 - Togo Safe Water

GS-3168 ↗ · current registry ID: GS11181

#1208of 1329 in Industrial#11of 15 in Togo#1672of 1801 in Gold Standard (GS)

3.8/ 10
Integrity
3.5
Transparency
4.5
Claim Safety
4.0
Documentation
3.0

Audit Analysis

The Togo Safe Water project (VPA 308 under PoA GS1247) is a Gold Standard safe-water/borehole avoidance project verified by SustainCERT, but the verification report (August 2024) reveals an extraordinary volume of material findings and corrective actions—over 60 of each—spanning ER calculation errors, water-quality-related monitoring gaps, SDG reporting inconsistencies, and unresolved forward action requests. Ten cross-document contradictions in key parameters (leakage, fNRB, ERR, crediting period, additionality test type) further undermine confidence in the data. The project's additionality is VVB-confirmed and no reversals have occurred, but the sheer density of unresolved issues and the low extraction confidence place it well below acceptable quality thresholds.

Red Flags

  • Over 60 material findings and 60+ corrective actions remain open in the verification report (Aug 2024), including ER calculation errors in Parameters Cj and Xboil, incorrect technology-days for boreholes with failed water-quality tests, and SDG impacts reported collectively for all 5 VPAs instead of individually
  • Ten cross-document contradictions in key parameters (leakage justification, fNRB value and method, ERR, usage rate, additionality test type, crediting period, benefit sharing, reversal events, leakage deduction) indicate systemic data-reliability problems
  • Leakage deduction is 0% in the verification report but 5% in the PDD; the justification is 'quantified' in the VR but 'deemed negligible' in the monitoring report—two different rationales for the same 0% figure
  • min_extraction_confidence is rated 'low', meaning at least one key document was poorly readable, compounding the already extensive data gaps
  • Multiple Forward Action Requests (FAR 01–05) remain open, including VPA-level SDG indicator evaluation and fNRB reporting, indicating the verification cycle is not yet closed

Credit Vintages

IssuedRetiredAvailable
2022
1,42401,424
2023
6,84206,842
2024
4,45504,455
Total12,721012,721

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction with contradictory justifications

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents