Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 39 Improved Kitchen Regimes: Bugesera, Rwanda

GS-674 ↗ · current registry ID: GS3947

#967of 1329 in Industrial#86of 139 in Rwanda#1393of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This Gold Standard cookstove project in Bugesera, Rwanda has a VVB-confirmed additionality assessment and no reported reversal events, but is undermined by a severe usage-rate gap (90% assumed in the PDD versus 23.3% verified in the monitoring report), a zero leakage deduction that contradicts the PDD's planned 5%, and the absence of any buffer pool. The identical claimed and verified ERR figures (14,700 tCO₂e) raise questions about whether the verification independently recalculated emissions given the large divergence between assumed and actual usage. Multiple unresolved Forward Action Requests and contradictions across documents further weaken confidence in the project's data integrity.

Red Flags

  • Usage rate assumed at 90% in the PDD but verified at only 23.3% in the 2022 monitoring report — a 3.8× gap that, if not already reflected in the ERR calculation, represents a major over-crediting risk
  • Leakage deduction of 0% in the 2022 monitoring report contradicts the PDD (2023) which planned a 5% deduction; the justification shifted from 'quantified' (2021) to 'deemed negligible' (2022) without clear reconciliation
  • No buffer pool is stated in any available document, leaving no financial backstop against potential reversal of avoided emissions
  • Five Forward Action Requests (FAR 01–05) covering SDG indicators, fNRB reporting, and monitoring justification remain open per the verification report
  • fNRB value contradicts between 0.98 (2022 monitoring report) and 0.85 (2023 PDD), a 15% swing that materially affects the baseline calculation

Credit Vintages

IssuedRetiredAvailable
2014
6576570
2015
9,8779,770107
2016
9,9199,9190
2017
9,7789,74830
2018
8,8218,645176
2019
6,1396,025114
2020
2,2482,2444
2021
1,0351,0350
Total48,47448,043431

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

0% deduction contradicts PDD 5% plan

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents