GS1247 VPA 40 Improved Kitchen Regimes: Dissemination of improved stove in Zoba Anseba, Eritrea 2
GS-1534 ↗ · current registry ID: GS4036
#450of 1329 in Industrial#14of 38 in Eritrea#709of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard cookstove dissemination project in Eritrea (LDC) with VVB-confirmed additionality and a conservative local-field fNRB, but undermined by 14 inter-document contradictions, five still-open follow-up actions, and a material inconsistency in the leakage deduction (0% in the monitoring report versus 5% in the PDD). The project has been operating since 2016 with multiple monitoring cycles, yet the volume of corrective actions and the conflicting crediting-period dates (2016–2028 vs. 2025–2030) raise questions about the coherence of the project's documentation trail.
Red Flags
- Leakage deduction is 0% in the 2023 monitoring report but 5% in the PDD (2023); the verification report (2022) states leakage was 'not addressed' — a material inconsistency in a project type where displaced firewood collection could shift to other households.
- Five follow-up actions (FAR 01–05) remain open, including the requirement to submit an fNRB report at VPA level and to justify monitoring options, indicating unresolved methodological gaps.
- Crediting period is stated as 2016-01-10 to 2028-01-02 in the 2023 monitoring report but 2025-05-01 to 2030-04-30 in the 2025 validation report — a nine-year discrepancy that affects the validity of all prior credit claims.
- Safeguards documentation is contradictory: the 2022 verification report confirms safeguards are mentioned, while the 2023 monitoring report states they are not, creating uncertainty about the project's social-compliance record.
- The project relies on 'deemed additionality' for LDC status in Eritrea, which, while permissible under Gold Standard, reduces the empirical rigor of the additionality claim.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 6,403 | 3,120 | 3,283 | |
| 2017 | 10,086 | 9,885 | 201 | |
| 2018 | 9,672 | 9,479 | 193 | |
| 2019 | 8,975 | 8,796 | 179 | |
| 2020 | 8,017 | 7,858 | 159 | |
| 2021 | 7,897 | 7,740 | 157 | |
| 2022 | 7,896 | 7,805 | 91 | |
| 2023 | 6,569 | 3,808 | 2,761 | |
| 2024 | 3,762 | 0 | 3,762 | |
| Total | 69,277 | 58,491 | 10,786 |
Risk Indicators
VVB-confirmed combined test
Energy efficiency – no reversal risk
0% vs 5% inconsistency across docs
Project-specific, reassessed 2024
FPIC & grievance present but docs conflict
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →