GS1247 VPA 46 Eritrean District Boreholes

GS-792 ↗ · current registry ID: GS4423

#255of 1329 in Industrial#9of 38 in Eritrea#430of 1801 in Gold Standard (GS)

5.4/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.0

Audit Analysis

A Gold Standard borehole water-supply project in Eritrea with VVB-confirmed additionality and no reversal events, but undermined by a dense set of material findings, unresolved contradictions in leakage treatment and crediting-period dates, and the absence of any stated buffer pool. The project delivers its claimed reductions for the monitoring period, yet the data-quality issues and open corrective actions limit confidence in the robustness of the credit.

Red Flags

  • Crediting period is contradictory: the monitoring report (2023) states 2015-2022 while the validation report (2025) states 2025-2030; the monitoring period (2023-2024) does not fall within either, creating ambiguity about which period the 37,380 tCO₂e applies to.
  • Leakage deduction was 5 % in the PDD but reduced to 0 % in the 2023 monitoring report on the basis of 'deemed negligible', with no quantified justification provided.
  • No buffer pool or permanence mechanism is stated in any available document, leaving reversal risk (borehole failure, pump breakdown) unmitigated.
  • Multiple open FARs (SDG indicators at VPA level, fNRB report, monitoring-option justification) and CARs (RCF date clarity, double-counting prevention, seasonality in usage surveys) remain unresolved.
  • ERR figures differ between two verification reports (33,064 in Jan 2023 vs 37,380 in Sep 2023), attributed to table inconsistencies that were 'now amended'.

Credit Vintages

IssuedRetiredAvailable
2015
1261260
2016
10,00010,0000
2017
10,00010,0000
2018
8498490
2019
9,1519,1510
2020
6,8396,8390
2021
9,3585,8883,470
2022
8,5833,8114,772
Total54,90646,6648,242

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% deduction, inconsistent with PDD 5%

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC, grievance, benefit sharing

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents