GS1247 VPA 46 Eritrean District Boreholes
GS-792 ↗ · current registry ID: GS4423
#255of 1329 in Industrial#9of 38 in Eritrea#430of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard borehole water-supply project in Eritrea with VVB-confirmed additionality and no reversal events, but undermined by a dense set of material findings, unresolved contradictions in leakage treatment and crediting-period dates, and the absence of any stated buffer pool. The project delivers its claimed reductions for the monitoring period, yet the data-quality issues and open corrective actions limit confidence in the robustness of the credit.
Red Flags
- Crediting period is contradictory: the monitoring report (2023) states 2015-2022 while the validation report (2025) states 2025-2030; the monitoring period (2023-2024) does not fall within either, creating ambiguity about which period the 37,380 tCO₂e applies to.
- Leakage deduction was 5 % in the PDD but reduced to 0 % in the 2023 monitoring report on the basis of 'deemed negligible', with no quantified justification provided.
- No buffer pool or permanence mechanism is stated in any available document, leaving reversal risk (borehole failure, pump breakdown) unmitigated.
- Multiple open FARs (SDG indicators at VPA level, fNRB report, monitoring-option justification) and CARs (RCF date clarity, double-counting prevention, seasonality in usage surveys) remain unresolved.
- ERR figures differ between two verification reports (33,064 in Jan 2023 vs 37,380 in Sep 2023), attributed to table inconsistencies that were 'now amended'.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 126 | 126 | 0 | |
| 2016 | 10,000 | 10,000 | 0 | |
| 2017 | 10,000 | 10,000 | 0 | |
| 2018 | 849 | 849 | 0 | |
| 2019 | 9,151 | 9,151 | 0 | |
| 2020 | 6,839 | 6,839 | 0 | |
| 2021 | 9,358 | 5,888 | 3,470 | |
| 2022 | 8,583 | 3,811 | 4,772 | |
| Total | 54,906 | 46,664 | 8,242 |
Risk Indicators
VVB-confirmed combined test
no reversals
0% deduction, inconsistent with PDD 5%
Project-specific, reassessed 2024
FPIC, grievance, benefit sharing
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →