Skip to main content
GSEnergy Efficiency - DomesticRwandaGeneral Methodologyv2.1

GS1247 VPA 57 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-862 ↗ · current registry ID: GS4898

#1063of 1329 in Industrial#96of 139 in Rwanda#1505of 1801 in Gold Standard (GS)

4.2/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
3.5
Documentation
4.0

Audit Analysis

This Gold Standard borehole project under a cookstove PoA has a verified additionality assessment and no reversal events, but is undermined by a fundamental methodology-project mismatch (cookstove methodology applied to water infrastructure), twelve cross-document contradictions in key parameters, a 4× discrepancy in claimed emission reductions between monitoring reports, and over 30 outstanding corrective actions. The absence of verified ERR figures and multiple null fields in the extracted record further limit confidence in the project's quantified claims.

Red Flags

  • Methodology TPDDTEC v.4.0 (cookstove) is applied to a borehole/water project; corrective actions explicitly request justification of the methodology for water treatment technologies, indicating a fundamental fit issue
  • Claimed ERR of 38,968 tCO₂e (2021 monitoring report) versus 159,041 tCO₂e (2020 monitoring report) — a 4× discrepancy that is not explained by period length differences
  • Over 30 corrective actions remain open, including requests for baseline survey data, kitchen performance test results, NRB reports, and evidence of operational lifetime — suggesting the verification record is materially incomplete
  • Leakage treatment is contradictory: the 2021 monitoring report applies a 0% deduction with a 'deemed negligible' justification, while the 2023 PDD applies a 5% quantified deduction
  • FNRB value differs between documents: 0.98 (national default, 2021 monitoring report) versus 0.85 (local field, 2023 PDD), with the method also changing between national_default and local_field

Credit Vintages

IssuedRetiredAvailable
2015
1091090
2016
10,00010,0000
2017
10,00010,0000
2018
10,00010,0000
2019
8,5458,5450
2020
3,2101,9481,262
Total41,86440,6021,262

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

0% vs 5% contradiction across docs

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents