GS1247 VPA 58 Improved Kitchen Regimes: Kayonza District Borehole Project, Rwanda

GS-863 ↗ · current registry ID: GS4899

#891of 1329 in Industrial#75of 139 in Rwanda#1307of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
5.0
Transparency
4.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

This Gold Standard borehole project under a multi-country Improved Kitchen Regimes PoA shows a VVB-verified additionality assessment and no reversal events, but is undermined by a large number of unresolved corrective actions, multiple contradictions across documents in key parameters (leakage, FNRB, ERR figures, additionality test type), and the absence of a verified ERR figure. The project-specific baseline and the sector mismatch between a borehole activity and a cookstove methodology (TPDDTEC v.4.0) raise additional validity concerns.

Red Flags

  • 30+ corrective actions remain open, spanning PoA-DD eligibility, additionality of retroactive VPAs, baseline survey evidence, and methodology applicability to water treatment technologies
  • Additionality test type is contradictory within the same PDD (dated 2023-04-14): one section states 'combined' while another states 'investment'
  • No verified ERR figure was found in any available document, making it impossible to confirm actual delivery against the claimed 144,650 tCO₂e
  • Crediting period is contradictory: 2015–2022 (2020 monitoring report) vs 2025–2030 (2025 validation report), leaving the 2023–2024 monitoring period in a regulatory gap
  • Leakage treatment is contradictory: 0% deduction with 'deemed negligible' justification (2020 monitoring) vs 5% quantified deduction (2023 PDD)

Credit Vintages

IssuedRetiredAvailable
2015
3753750
2016
10,00010,0000
2017
9,8589,8580
2018
9,5309,5300
2019
8,4017,981420
2020
3,1703,1700
Total41,33440,914420

Risk Indicators

Additionality

VVB-verified but test type contradictory within same PDD

Permanence

mixed evidence / unresolved risk

Leakage

Contradictory: 0% (monitoring) vs 5% (PDD)

Baseline

Project-specific, reassessed 2024, but methodology applicability questioned

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA and CCP status not stated in any document

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents