Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 67 Zoba Debub Community Boreholes

GS-909 ↗ · current registry ID: GS5040

#700of 1329 in Industrial#30of 38 in Eritrea#1050of 1801 in Gold Standard (GS)

4.8/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

This Gold Standard water-borehole project in Eritrea displaces household fuel use and has a VVB-confirmed investment additionality test, but is undermined by a 0% leakage deduction that contradicts the 5% planned in the PDD, the absence of a buffer pool for physical infrastructure, and a large number of open corrective actions and material findings. Thirteen cross-document contradictions—including on FPIC status, additionality test type, and crediting period—further erode confidence in the data record, compounded by a low extraction confidence rating across 32 source documents.

Red Flags

  • Leakage deduction reduced from 5% (PDD, 2023) to 0% (verification report, 2024) with only a generic 'quantified' justification; no detailed leakage analysis is provided in the extracted record.
  • Fifteen-plus material findings and corrective actions remain open, including undemonstrated sampling confidence (CAR#2), unmet 1 km distance requirement for some households (CAR#5), and an unclarified objective observer (CAR#4).
  • FPIC status is contradictory: the 2018 verification report records it as not conducted, while the 2025 validation report records it as conducted; the basis for the change is not documented.
  • Low extraction confidence across the 32 source documents means key quantitative fields may be unreliable.

Credit Vintages

IssuedRetiredAvailable
2016
2942940
2017
10,00010,0000
2018
10,00010,0000
2019
7,4765,6371,839
2020
3,8682,5341,334
2021
4,6092,6042,005
2022
4,2432,7311,512
2023
2,40002,400
Total42,89033,8009,090

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

borehole failure risk

Leakage

0% deduction; PDD planned 5%; weak justification

Baseline

Project-specific; reassessed 2024

Safeguards

Grievance & benefit sharing present; FPIC contradictory

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents