Skip to main content
GSEnergy Efficiency - DomesticEritreaGeneral Methodologyv2.1

GS1247 VPA 68 Zoba Debub Community Boreholes

GS-910 ↗ · current registry ID: GS5041

#535of 1329 in Industrial#26of 38 in Eritrea#833of 1801 in Gold Standard (GS)

5.0/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

This Gold Standard water-borehole project in Eritrea displaces household fuel use and has VVB-confirmed additionality via a combined test, with no reversal events reported in the most recent monitoring. However, the 0% leakage deduction (reduced from 5% in the PDD), the absence of a buffer pool, a project-specific baseline, and a direct contradiction on whether FPIC was conducted materially weaken the integrity and claim-safety profile. Fourteen cross-document contradictions—many resolvable as unit or period differences but several substantive—combined with low extraction confidence and numerous open corrective actions, limit overall confidence in the data.

Red Flags

  • FPIC status is directly contradicted: the 2018 verification report states FPIC was conducted, while the 2020 monitoring report states it was not—a fundamental safeguards gap that cannot be resolved by recency alone.
  • Leakage deduction was reduced from 5% in the PDD (2023) to 0% in the 2024 verification report with only a 'quantified' justification; for a fuel-displacement project where households can revert to firewood, a zero deduction is aggressive.
  • CAR#5 (2024 verification report) flags that some households do not meet the 1 km walking-distance requirement of the TPDDTEC methodology, yet no explanation of how this was handled in monitoring was provided.
  • Low extraction confidence across 33 documents means at least one key document was poorly readable, reducing reliability of the extracted figures.

Credit Vintages

IssuedRetiredAvailable
2016
2542540
2017
10,00010,0000
2018
10,00010,0000
2019
7,2945,5571,737
2020
3,6612,3991,262
2021
4,3622,4661,896
2022
4,0601,2612,799
2023
2,31902,319
Total41,95031,93710,013

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals reported

Leakage

0% deduction, reduced from 5% in PDD

Baseline

Project-specific, reassessed 2024

Safeguards

FPIC contradiction; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents