GS1247 VPA 70 Zoba Debub Community Boreholes

GS-911 ↗ · current registry ID: GS5043

#968of 1329 in Industrial#32of 38 in Eritrea#1394of 1801 in Gold Standard (GS)

4.4/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.0
Documentation
4.0

Audit Analysis

This Gold Standard borehole project in Eritrea displaces fuel use for 600+ households across six villages, with VVB-verified additionality and no reversal events. However, the absence of a buffer pool, a 0% leakage deduction (contradicted by a 5% figure in the PDD), a project-specific baseline, and a claimed lifetime ER figure (79,172 tCO₂) that appears substantially higher than the per-year generation rate (~3,272 tCO₂/yr) raise meaningful concerns about over-crediting risk and permanence protection. Numerous open corrective actions and a low extraction confidence further temper confidence in the data.

Red Flags

  • No buffer pool or permanence mechanism is stated in any available document, leaving borehole-failure reversal risk unaddressed
  • Leakage deduction was reduced from 5% (PDD, 2023) to 0% (verification report, 2024) with only a 'quantified' justification; the 2023 verification report had not addressed leakage at all
  • The claimed/verified lifetime ER of 79,172 tCO₂ is roughly 24× the per-year emission reduction of ~3,272 tCO₂, suggesting the figure may span multiple crediting periods or be overstated relative to the 5-year crediting window (2025–2030)
  • CAR#5 (open): some households do not meet the methodology's 1 km walking-distance requirement for improved water access, yet their emissions reductions appear to be included
  • min_extraction_confidence is 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2016
4464460
2017
10,00010,0000
2018
10,0007,4762,524
2019
7,4865,6421,844
2020
3,8822,5431,339
2021
4,6262,6152,011
2022
4,2701,1063,164
2023
2,41902,419
Total43,12929,82813,301

Risk Indicators

Additionality

VVB-verified combined test

Permanence

no reversals to date

Leakage

0% deduction; contradicted by 5% in PDD

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents