Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS1247 VPA 86 Southern Ethiopia Community Boreholes

GS-1406 ↗ · current registry ID: GS5322

#375of 1329 in Industrial#7of 36 in Ethiopia#597of 1801 in Gold Standard (GS)

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

This Gold Standard community borehole and improved cookstove project in Southern Ethiopia has VVB-confirmed additionality and no reported reversal events, but is undermined by a 0% leakage deduction that contradicts the PDD's 5% estimate, a project-specific baseline, and an extensive list of open corrective actions and further assessment requests. Multiple contradictions across documents—particularly in ERR figures (2,229 vs 4,403 vs 21,874) and the crediting period—raise data-reliability concerns that temper confidence in the verified claims.

Red Flags

  • Leakage deduction dropped from 5% in the PDD (2023) to 0% in the 2026 verification report, with the justification shifting from 'deemed negligible' to 'quantified'—yet corrective actions still call for a detailed leakage analysis, suggesting the 0% figure is not yet robustly supported.
  • Three materially different ERR figures appear across documents: 2,229 (2026 verification report), 4,403 (PDD 2023), and 21,874 (2023 verification report). The 21,874 figure is nearly ten times the latest verified value and its basis (cumulative vs single-period, scope) is unexplained.
  • The crediting period is stated as 2017–2024 in the monitoring report but 2025–2030 in a 2025 validation report, creating ambiguity about which period the 2,229 verified ERRs actually cover.
  • Twenty-plus corrective actions remain on record, including missing repair confirmation forms, inconsistent crediting-period start dates across VPAs, and missing vintage-wise emission breakdowns.

Credit Vintages

IssuedRetiredAvailable
2017
5,4255,4250
2018
10,00010,0000
2019
4,6624,6620
2020
5,0125,0120
2021
2,9182,88830
2022
1,9901,95139
2023
4560456
Total30,46329,938525

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

infrastructure failure risk

Leakage

0% deduction; PDD had 5%; analysis still open

Baseline

Project-specific; reassessed 2024

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents