Skip to main content
GSEnergy Efficiency - DomesticEthiopiaGeneral Methodologyv2.1

GS1289: Native Hydraid BioSand Water Filter Programme East Africa: VPA (02) Ethiopia

GS-1592 ↗ · current registry ID: GS3509

#771of 1329 in Industrial#16of 36 in Ethiopia#1159of 1801 in Gold Standard (GS)

4.7/ 10
Integrity
4.3
Transparency
4.8
Claim Safety
4.8
Documentation
5.2

Audit Analysis

A Gold Standard water-filter project in Ethiopia displacing firewood, with VVB-confirmed additionality and no reversal events, but undermined by extensive data-quality issues: over 30 material findings, 17 corrective actions, and 9 cross-document contradictions including a 5.7× discrepancy in the lifetime ex-ante estimate between the PDD and the monitoring report. The verification process caught and corrected several substantive errors (CH₄ emission factor, Wb,y capping), but the volume of inconsistencies raises concerns about the reliability of the underlying monitoring data.

Red Flags

  • Lifetime ex-ante estimate differs by a factor of ~5.7 between the PDD (95,235 tCO₂e) and the monitoring report (16,684 tCO₂e), creating ambiguity in the pro-rata delivery ratio
  • CH₄ emission factor was corrected in both directions across reports (0.03→0.3 and 0.3→0.03), indicating unresolved uncertainty in a key parameter
  • 17 corrective actions remain open, including errors in the usage-rate calculation formula and discrepancies in emission-reduction values between the MR text and the ER spreadsheet
  • FNRB method changed between verification reports from local field measurement to national default without clear justification
  • Leakage justification is contradictory: the verification report states 'quantified' while the monitoring report states 'deemed negligible', yet the deduction is 0% in both

Credit Vintages

IssuedRetiredAvailable
2015
1,50001,500
2016
10,0004,6445,356
2017
9,9991999,800
2018
10,0001999,801
2019
9,8771839,694
2020
8,32608,326
2021
7,49007,490
2022
9,73909,739
2023
6,55906,559
2024
6,83306,833
2025
3,99503,995
Total84,3185,22579,093

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification inconsistent across docs

Baseline

Project-specific, reassessment date not stated

Safeguards

Grievance & benefit-sharing present; FPIC not stated; stakeholder issues flagged

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents