GS1290: Native Clean Water Programme Central America: VPA (01) Honduras
GS-1588 ↗ · current registry ID: GS1332
#833of 1329 in Industrial#10of 20 in Honduras#1232of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard water-filter project in Honduras with a verified combined additionality test but a long list of material findings including a 10× CH₄ emission-factor error, over-crediting of 556 tCO₂e in earlier periods, and a 0% leakage deduction whose justification is contradicted between the verification and monitoring reports. The verification process did catch and discount the over-claims, but the volume of corrective actions (30+) and the absence of a buffer pool for a project whose physical assets (filters) can fail leave meaningful integrity and permanence risk.
Red Flags
- CH₄ emission factor entered as 0.3 instead of 0.03 in initial ex-ante calculations — a 10× error that was later corrected
- Over-crediting of 556 tCO₂e for 2018–2020 due to exceeding the microscale cap, plus 5.584 tCO₂e from installation-date discrepancies
- Leakage deduction of 0% with contradictory justifications: the verification report (Mar 2024) says 'quantified' while the monitoring report (Jul 2024) says 'deemed negligible'
- FPIC not conducted despite the project serving local/indigenous communities in Honduras
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 170 | 170 | 0 | |
| 2013 | 2,264 | 2,264 | 0 | |
| 2014 | 5,111 | 5,111 | 0 | |
| 2015 | 5,369 | 5,369 | 0 | |
| 2016 | 3,058 | 3,022 | 36 | |
| 2017 | 6,968 | 6,946 | 22 | |
| 2018 | 10,086 | 4,223 | 5,863 | |
| 2019 | 10,370 | 207 | 10,163 | |
| 2020 | 10,110 | 201 | 9,909 | |
| 2021 | 9,434 | 70 | 9,364 | |
| 2022 | 9,111 | 0 | 9,111 | |
| Total | 72,051 | 27,583 | 44,468 |
Risk Indicators
VVB-confirmed combined test
physical assets at risk
0% deduction; contradictory justification
Project-specific; no reassessment date found
Grievance mechanism present; FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →