GS1290: Native Energy Clean Water Central America: VPA (04) Honduras (GS 7356)
GS-1599 ↗ · current registry ID: GS7356
#536of 1329 in Industrial#7of 20 in Honduras#834of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard domestic water-filter project in Honduras displacing thermal energy for water boiling, with VVB-confirmed additionality and no reversal events, but undermined by a 10× CH₄ emission-factor error in prior verifications, 17 material findings, 10 corrective actions, and a VVB-requested downward ERR adjustment from 18,225 to 7,440 tCO₂e that raises material over-crediting concerns.
Red Flags
- CH₄ emission factor was erroneously entered as 0.03 tCO₂/TJ in previous verifications and corrected to 0.3 tCO₂/TJ — a 10× error that likely inflated prior credit issuance
- VVB corrective action requests adjustment of total ERs from 18,225 to 7,440 tCO₂e (a 59% reduction) after correcting parameter Nj,y, yet the verification report still carries the higher figure
- 17 material findings and 10 corrective actions in a single verification cycle indicate systemic MRV and reporting weaknesses
- Leakage justification is inconsistent between the verification report ('quantified') and the monitoring report ('deemed negligible') for the same reporting date
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 991 | 0 | 991 | |
| 2020 | 6,367 | 0 | 6,367 | |
| 2021 | 6,986 | 89 | 6,897 | |
| 2022 | 7,741 | 0 | 7,741 | |
| 2023 | 8,357 | 0 | 8,357 | |
| 2024 | 7,075 | 0 | 7,075 | |
| Total | 37,517 | 89 | 37,428 |
Risk Indicators
VVB-confirmed combined test
Energy-efficiency; no reversal events
0% deduction; justification wording inconsistent across reports
Project-specific; no reassessment date stated
Grievance mechanism and benefit sharing present; FPIC not conducted
CCP and CORSIA status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →