GS1309 Low cost irrigation devices programme in India-VPA 02

GS-181 ↗ · current registry ID: GS1311

#737of 975 in India#1233of 1801 in Gold Standard (GS)#6of 10 in AMS-I.B

4.6/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
3.0
Documentation
6.0

Audit Analysis

This Gold Standard irrigation-device project in India has a combined additionality test and a reputable VVB (Lloyd's Register), but the verified emissions reductions for a ~2-year monitoring period (148,822 tCO₂e) exceed the entire 10-year ex-ante lifetime estimate (103,001 tCO₂e) by roughly 45%, raising serious over-crediting concerns. The project-specific baseline, 100% usage-rate assumption without independent verification, and 0% leakage deduction with only a 'deemed negligible' justification further weaken the integrity and claim-safety profile.

Red Flags

  • Verified ERs (148,822 tCO₂e) for a ~2.1-year monitoring period are approximately 6.7× the pro-rata expectation derived from the 10-year ex-ante lifetime estimate of 103,001 tCO₂e, indicating a severe over-crediting signal.
  • Usage rate assumed at 100% (1.0) in the PDD with no verified usage-rate figure or end-use tracking found in the extracted record.
  • Leakage deduction of 0% justified only as 'deemed negligible' in the verification report, while the monitoring report does not address leakage at all — a contradiction that weakens the justification.
  • No buffer pool percentage stated, no permanence claim period stated, and no reversal events explicitly confirmed as zero — permanence risk is unaddressed.
  • Three corrective action requests (CARs) in the verification report, including an incorrect diesel emission factor that initially inflated ERs by ~5,400 tCO₂e.

Credit Vintages Exhausted

IssuedRetiredAvailable
2012
12,33412,3340
2013
12,86412,8640
Total25,19825,1980

Risk Indicators

Additionality

Combined test present but VVB sign-off not explicitly confirmed in record

Permanence

no reversal events confirmed

Leakage

0% deduction, 'deemed negligible' only; monitoring report silent on leakage

Baseline

Project-specific baseline; no reassessment date documented

Safeguards

Safeguards and grievance mechanism mentioned; FPIC not documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-03AMS I.B

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents